The Corozal to Sarteneja Road upgrading project in approximately 43.2km (27 miles) in length long. It commences at the junction of the Philip Goldson Highway (near Mile 82.5) and South-End Street in Corozal Town.
The Corozal to Sarteneja Road upgrading project in approximately 43.2km (27 miles) in length long. It commences at the junction of the Philip Goldson Highway (near Mile 82.5) and South-End Street in Corozal Town.